Easy Design Agency Get the free audit

Websites for electricians

An electrician's website that wins the panel job before the second quote

The homeowner is holding a phone in front of a panel she does not understand. She wants to know you are licensed, what it will roughly cost, and who deals with the inspector.

  • Back within one business day
  • No sales call
  • Your site next to the electricians near you
Crescent Plumbing, our demo plumbing website, on a phone: a flat-rate price board, call and text buttons and an arrival-time map on the first screens Under 1 s to load Call and text on screen one
Crescent Plumbing, one of our demo sitesThis is our plumbing demo; we have no electrician demo yet. Yours gets the same build with your license, services and towns. Fictional company, real build. Open it on your phone.

An electrician's website wins the big job on a phone when the first screen says electrician, names the town, shows the license number and puts the call button under the thumb. Panels, EV chargers and generators each get their own page with a price range, what the job includes, and one plain line saying you pull the permit and meet the inspector.

License and insurance go where she looks first

Electrical is the trade where the homeowner is scared of the work itself. She cannot judge a panel the way she can judge a shingle, so she checks the one thing she can. The FTC's advice to homeowners is to consider only contractors who are licensed and insured, to confirm the license with the state or county, and to ask for proof of insurance.1 Your first phone screen should answer that before she has to ask:

  • The headline says electrician and says where. "Licensed electrician in Travis County" does the whole job. A slogan about powering your life does none of it.
  • The license number is printed, not implied. "Licensed and insured" alone cannot be checked. Your state or local license number, whichever your area issues, can. Put it on the first screen, next to the words.
  • Call first, text second. A breaker that keeps tripping is a phone call. The call button or form answer explains why the form comes third for this trade.
  • One line for the planned job. "Panel, EV charger or generator? See prices and what's included." Three links, out of the way of the person whose lights are out.

In some places the number is also the law. California's contractor board says to put your license number on all advertisements, and its list includes any website that solicits business on the internet, with fines of $100 to $1,000 for a first offense.2 Texas requires an electrical contractor's license number on both sides of each vehicle and on proposals, invoices and written contracts; that rule covers trucks and paperwork, not the website.3 Check the rule where you work. A number she can check earns its place on the site either way. The first phone screen guide has the rules every trade shares.

The panel upgrade page

The people who land on this page are usually holding a reason: an inspector's note from a home sale, a new heat pump that needs more capacity, a car on order. Name those reasons in the first lines so she sees her own situation. Then give her:

  • A range from your own invoices. Take your recent panel jobs, cut the strangest two at each end, and print the low and the high that is left. Then say what moves it: the service size, moving the meter, the run to the panel, whether the utility has to come out. The short answer on prices covers how to word it.
  • What the day looks like. How long the power is off. Whether anyone needs to be home. What happens to the freezer. Those are the questions she is too embarrassed to call about.
  • The tax credit, stated correctly. If your page still advertises the federal credit that covered panels, take it down. It paid up to $600 for a qualifying panel of 200 amps or more,4 and it does not apply to anything placed in service after December 31, 2025.5 Otherwise the customer finds out from her tax preparer and remembers who told her. List any state or utility rebate you have confirmed yourself.

The EV charger page

Answer the question she actually has: will my panel handle this? A Department of Energy consumer handbook, older but still right on this, describes home Level 2 charging as 240 volts on a dedicated circuit of 20 to 100 amps, says installation usually requires a licensed electrical contractor, and says a home assessment should determine whether the panel has the capacity.6 Write the page in this order:

  1. The price range for a straightforward install, with what "straightforward" means: the distance from panel to charger, and a panel with room.
  2. What happens when the panel cannot carry it: the load calculation, a load-management device if that works, and a panel upgrade if it does not.
  3. Charger or outlet, in two sentences, and whether you install the unit she bought online.
  4. A photo of a tidy install in a real garage, with the town in the caption.

Check this page for the same stale promise. The federal credit for home chargers does not apply to property placed in service after June 30, 2026.5 Even before that it was limited to eligible census tracts, so a line reading "30% back" never applied to everyone.7

The generator page

This page gets read right after an outage, so it has to be ready before one. Split it into two jobs, because the homeowner does not know they are different: a standby unit that starts by itself, and a safe way to connect the portable one she already owns.

The second one is your opening. The Consumer Product Safety Commission tells homeowners never to power the house wiring by plugging a generator into a wall outlet, which it calls backfeeding.8 A page that says so plainly, then explains the transfer switch or interlock you install to do it safely and gives a price for that install, reads as the honest electrician in town. Then list what a standby job includes, what size runs what, and how the fuel gets connected and by whom, if that is someone other than you.

Say who pulls the permit

One sentence on each big-ticket page: "We pull the permit, schedule the inspection and meet the inspector." If that is what you do, say it. The FTC lists a contractor asking the homeowner to get the required building permits as a warning sign of a scam,1 so saying you handle it answers a fear she may not be able to name.

Then add what she will see: the permit posted or filed, a date for the inspection, and a copy of the sign-off for her records, which she will want when she sells the house. The Department of Energy's handbook notes that local authorities may require permits for a charger too,6 so the sentence belongs on that page as well. Do not write "permit included" unless the fee is in your price; say which it is.

What the audit measures for an electrician

  1. A security warning on phones (an expired or misconfigured certificate), reported first when found, because nothing else matters until it is fixed.
  2. No call button on the first phone screen, from a real 390 x 844 screenshot and a tap test, with how many screens down the first callable thing is.
  3. Load time on a phone against Google's 2.5-second line and against the nearby electricians we can find and measure. The speed guide explains the test.
  4. A pop-up covering the first screen, with the share it covers.
  5. What the speed costs in panel upgrades a year, at an assumed $2,500 panel job, every assumption printed.
  6. The AI-readiness check: which AI crawlers your site blocks, whether your business is declared in structured data as an Electrician,9 and whether the page states your town. The AI answers guide explains why those matter.
How the numbers are made

The method page has the exact rules for every check above. The monthly pieces in the data section start with roofing, HVAC and plumbing, so we do not quote shares for electricians here.

The pages an electrician's site needs

  • Home: the first screen above, then the three big jobs, the reviews, the towns.
  • Panel upgrades, EV chargers, generators: the three pages above, each with a range and the permit line.
  • Troubleshooting and repairs: tripping breakers, dead outlets, flickering lights, in the words she would type, with your visit fee.
  • Lighting, ceiling fans and outlets: the small jobs, with flat rates, because they are how a homeowner tries you out before the panel.
  • About: the license number again, the insurance, who actually shows up.
  • Towns: one page per town you serve, each with a real job and a real review from that town. The town pages answer covers what makes one count.

The same build serves the other trades with different words; compare the roofing, HVAC and plumbing pages.

Questions electricians ask

Every panel is different. How can I publish a price?

Publish a range and what moves it, not a quote. "Most of our 200-amp upgrades land between these two numbers; a meter move or a long run adds to it." The site still ends in a visit, and the people who call have already accepted the ballpark.

Won't printing my license number invite complaints?

Anyone who wants it can already find it, and in some states it has to be on your advertising anyway. On the site it does one job: it lets a nervous homeowner check you, which is the check the FTC tells her to make.

I do commercial work too. Does that go on the same site?

Yes, on its own page, with one quiet link from the first screen. The homeowner and the property manager want different things; a home page written for both speaks clearly to neither.

Do you have a demo for electricians I can look at?

Not yet. The plumbing demo is the closest match, since both trades get the urgent call and the planned job. Your site would carry your license, services, towns and photos; the free audit shows what yours does on a phone today.

Sources

  1. Federal Trade Commission: How To Avoid a Home Improvement Scam. Checked November 2026.
  2. California Contractors State License Board: Advertising Guidelines For Contractors. Checked November 2026.
  3. Texas Department of Licensing and Regulation: Electricians Compliance Guide. Checked November 2026.
  4. IRS: Energy Efficient Home Improvement Credit. Updated April 2026.
  5. IRS: FAQs on the 2025 changes to sections 25C and 30C (FS-2025-05, August 2025).
  6. U.S. Department of Energy, Alternative Fuels Data Center: Plug-In Electric Vehicle Handbook for Consumers (February 2015).
  7. IRS: Instructions for Form 8911 (December 2025).
  8. U.S. Consumer Product Safety Commission: Portable Generator Hazards.
  9. Schema.org: Electrician.

What it costs

One fee. The site, the hosting, the weekly work.

Three engines, 12 months from the day you approve the staging site. The cost guide puts them next to every other way a site is sold.

Standard Engine

The site that books the call.

$700/month

$1,200 today: $500 setup plus month one.

See what's included

Dominance Engine

Own the area.

$1,300/month

$1,800 today: $500 setup plus month one.

See what's included

Full first payment back if you don't love the staging site within 14 days. Mobile performance 90+ and main content under 2.5 seconds at launch, or no monthly fee until it is. Staging in 14 days or the first month is free. We don't promise rankings, AI citations or a number of leads. Terms apply.

Start here

See your site next to the electricians near you.

Free, written, back within one business day. Your site on a phone, the load time, the first screen, and the competitor that is winning the search.